Custom Multi Color Coating Thermal Insulation Board / Insulated Panels For Wall

Item No.: ZB021
Our insulation decorative panel can be multi color coating, it is thermal insulation board, also customer can choose their own design, it is a construction innovative industry.
  • Brand Name ZANBOND
  • Terms of Trade FOB,CIF,CFR
  • Payment Type L/C,T/T, Western Union
  • Min. Order 1000.00㎡
  • Exporting Port Ningbo/Shanghai China
  • Usage Exterior wall for fireproof hotel, building cladding
  • Description Parameter Comparation Installation
    Product Name
     
    Custom Multi Color Coating Thermal Insulation Board / Insulated Panels For Wall
     
    Model No.
    ZB021
    Thickness
    25-50mm
    Usage
    Exterior panel for hotel cladding
    Special Services
    Construction Technical Guidance
    Packaging
    Wooden Box / Carton Box / Customize
    Delivery Time
    35 days,rush orders are avaliable 
    Certificate
    ISO9001,CE,SGS
     Productivity
    200,000.00 ㎡ per Month
    Place Of Origin
    China
    Supply Ability
    2400,000  Per Year
     
    Product Introduction
    Perlite tailings, shale, feldspar, micro-powder, etc. are used as the main raw materials, grinding, granulating, sieving, powder preparation, secondary cloth, dry pressing, glaze decoration, 1200 °C high temperature roasting foaming, quenching The process of cooling, cutting and other processes is prepared by one-time sintering and expansion, and the light prefabricated imitation stone ceramic veneer insulation board is integrated with thermal insulation performance. The finish layer and the insulation layer are not sintered at the interface.

    The product has light bulk density (280-330kg/m3), low thermal conductivity (0.085~0.065w/(m·k)), very low volume water absorption (≤1.5%), good fire resistance (combustion performance A(A1) Grade), tensile strength greater than 0.15MPa, rich external finish, strong material structure and performance stability, good durability, simple construction and installation, cost-effective similar products, wide application fields, and the same life span of buildings. It is currently the first choice to meet the requirements of building energy-saving design and replace traditional insulation materials.


    Advantages
     ►Property Life Extended: Defective properties are stabilised, extending the life of them by at least 70 years.
     ►Quality: High quality customer and technical support along with independent testing of our system give you reassurance.
     ►Low Maintenance Costs: Robust systems with high levels of weather protection and impact resistance.
     ►Cost Effective: Compare to other alternative solutions our system is much more cost effective.
     ►Healthier Living Environment: Your houses will be warmer and have less damp, mould growth and draughts.
     ►Minimising Disruption: All work is carried out externally meaning your tenants can remain in their homes.
     ►Homes Transformed:A wide range of finishes for you to choose from which can transform whole streets.

     ►Sustainability: Extending the life of your existing housing stock, rather than demolishing them, is a sustainable solution.


    Factory Introduction
























    Adhering to the market-led, technology-driven, management and development of the concept, our manufactory has formed a large production scale, which includes annual output of inorganic thermal insulation mortar and various types of special mortar 300,000 tons, new foam insulation board (Phase I project) 1.2 million square meters,1 million square meters of thermal insulation decorative board, is the key backbone enterprise of the building materials industry in the Zhejiang province.





    Five Advantages
    1) Land and tax policies with local government privileges
    2) The core technology of new foam ceramic insulation board production
    3) The largest reserves and the best quality perlite ore resources in East China
    4) The high-tech research and development team
    5) The most advanced foam insulation board research and development equipment in China



    Application Scope
    Virtually all common types of construction - new build (from steel frame to solid masonry) or refurbishment (traditional and non-traditional house types), such as industry halls, warehouses, logistic centers, commercial buildings, office, sport halls as well as rural buildings. Contact Manufacturer Technical Services for specific advice.



    Our Service

    ZANBOND own a series of technological support to meet the customer demand.

    Professional solution team accompany with you from the beginning of the project plan to project design and management,to provide accurate engineering analysis and perfect design as customer demand, comfirm the best solution to you .

    ZANBOND always provide professional, high quality and caring efficient services.we provide pre-sales analysis,technical consulting,and installating guide when we sell,and also after-sale service,one to one professional and efficient service and 24 hours online consultation.




    FAQ
    What exactly is external wall insulation?
    Basically, a system of boards of thermally insulating material that are fixed to the building exterior and finished with a weather resistant, decorative render.ZANBOND offers a professional insulated wall panel systems to meet the needs of insulation market sectors. Our wall systems offer superior quality and high R-values, while providing a modern look. ZANBOND insulated wall panels are the ideal solution to create and maintain a high performance building envelope.

    Why should I consider external wall insulation?
    Up to 35% of heat lost from poorly insulated buildings escapes through the walls. External wall insulation significantly reduces this heat loss, leading to a reduction in annual fuels bills by as much as 25%. External Wall Insulation systems also protect the building structure, prevent deterioration, and overcome thermal bridging and condensation problems. Newbuild In a newbuild instance EWI systems are the most cost effective way of achieving the current & future thermal performance requirements for the building regulations, achieving an internal environment with low temperature fluctuations and low heating requirements.

    What can I do if my climate zone requires a higher R-value?
    Create an ZANBOND System.It is suggested that the insulation effect can be composed of three parts: the first is the self-insulation of the wall, the second is the combination of external insulation and internal insulation, and the third is the cooperation of ground insulation;




     
    The Performance Parameter
    ITEM UNIT Technical indicators
    Iy IIy
    Thermal Conductivity (Exclude glaze layer) W/(m•K) λ≤0.065
    Density kg/m3 ρ≤280 280<ρ≤330
    Heat storage coefficient W/(m2•K) ≥1.3
    Compressive strength Mpa ≥0.60 ≥0.70
    Flexural strength Mpa ≥0.60
    Tensile strength perpendicular to the plane of the board Mpa ≥0.15
    Pollution resistance -- ≥level 3
    Thermal shock resistance -- No crack on the glazed surface after the test
    Glaze crack resistance -- No cracks, no peeling, no damage after the test
    Chemical resistance -- Level GLA
    Frost resistance -- No cracks, no peeling, no damage after the test
    Volume water absorption   ≤1.5
    Combustion performance rating   A(A1)






     
    Product Common Size
    Length Width Thickness
    300 600 25、30、35、40、45
    600 600
    900 600
    1200 600
    1200 900
    Note: Other sizes are agreed by the supplier and the buyer
    Dimension Tolerance
    ITEM NORM
    Length,Width ±2.0
    Thickness ±2.0
    Diagonal difference ≤3.0
    Warpage ≤2.0
    Vertical deviation  ≤2.0
     
    1)Compared with natural stone
     
     
    ZANBOND insulation and decorative panel
    Nature stone
    Water absorption rate
    Low
    Low
    Thermal insulation performance
    Excellent thermal conductivity of 0.064 or less
    Poor
    Noise reduction
    Smooth, loose, multi-closed hole structure for better noise and noise reduction
    Poor
    Health and Environmental Protection
    This product material is simple to take, no pollution after high temperature sintering
    Different regions have different natures and may have radiation that endangers human health
    Maintenance and safety
    This product uses Anchorage combination construction technology , product firm, almost no post-maintenance, non-shedding risk
    Natural stone must be inspected and maintained regularly, and the hidden dangers cannot be ruled out.

    2)Compared with common decorative materials

    Compared with similar products, this product has obvious advantages. It is called an industry disruptive product by many experts.
     
    ZANBOND insulation and decorative panel
    Glass curtain stone wall
    coating
    stone
    Metal panel
    Acid and alkali resistant
    Very good
    Very good
    Bad
    Bad
    General
    Stain resistance
    Good
    Very good
    Bad
    General
    Good
    Weight
    Light
    Heavy
    Light
    Heavy
    Heavier
    Thermal insulation
    Very good
    Bad
    Bad
    General
    Bad
    Energy saving
    Very good
    Bad
    Bad
    General
    Bad
    Environmental protection
    Very good
    General
    Bad
    Good
    General
    Construction difficulty
    Easy
    Difficult
    General
    Difficult
    General

    3)Compared with common insulation materials
     
     
    ZANBOND insulation and decorative panel
    Polystyrene board
    Polyurethane board
    Thermal insulation mortar
    Type
    Inorganic lightweight board
    Organic
    Organic
    Organic lightweight aggregate
    Thermal conductivity (no finishing)
    《0.065
    《0.041
    《0.024
    《0.085
    Link processing
    Easy
    Complex
    Complex
    Complex
    Construction methods
    Bonding and  anchor
    Bonding
    Bonding and anchor
    Bonding
    Construction Conditions
    Low requirement
    High requirement
    High requirement
    General requirement
    Construction Period
    Short
    Long
    Long
    Long
    Adhesion
    Strong
    Weak
    Weak
    Weak
    Empty drum effect
    Difficult to hollow
    Easy to hollow
    Not easy to hollow
    Easy to hollow
    Anti-negative wind pressure
    Strong
    Weak
    General
    Weak
    Damage maintenance
    Damage repair only
    All repair
    Difficult to repair
    All repair
    Repair cost
    Low
    High
    High
    High
    Service life
    Not less than 25 years
    10-15 years
    5-10 years
    15-25 years
    Combustion performance rating
    A(A1)级
    B
    B
    A

    4)Comparison with common external insulation system construction

    Dry stone hanging: 9 levels, more than 21 processes
    Insulation integrated board: 5 levels, 10 standard processes
    Paint finish: 9 levels, more than 30 processes

     
    1)THE FIRST STAGE
    1.Scene investigation: view project overview, construction difficulty, view water and electric power supplier, roads, material handling, etc., and then implement.
    2.Preparation: measurement of the base surface, design grid, sort, deepen overall façade layout.
    3.Technical clarification: with the first party, supervisors, designers negotiated exterior wall construction design jointly, such as grid scheme facades, color, etc., and then turn over to the construction workers.
     
    2)THE SECOND STAGE
    1.Suspension wire: before the plastering, dropping first, then punching, after do ash cake--- by Civil construction 
    2.Split line: after plastering, construct the grids in strictly accordance with the design which was confirmed by proprietor and supervisor, then reserve the grid seams.
     
    3)THE THIRD STAGE
    1.Drilling positioning for anchor : to drilling 50mm hole at the bottom plate and joint of panels with percussion drill.
    2.Install the anchor: fixing the anchor at the wall with expansion bolts.
    3.Perimeter fastener positioning drilling: drilling around the panels with percussion drill.
    4.Embedding expansion bolts
    5.Strong adhesive scraping surface of energy saving fanel: Scraping the adhesives around the panels in point frame method with batch knife. Scrap the center of panel by point method, the scraping rate is more than 50%of the panel.
    6.Installation of integrative panel: put the insulation and decorative panel on the professional horizontal bearing brackets.
    7.Initial fixing: put the insulation and decorative panel on the professional horizontal bearing brackets.
    8.Positon calibration: drilling around the panels with percussion drill.
    9.Paste reinforcement: fixing the panel on the wall steadily and compact it gently. Don’t hit the surface of panels in case of surface coating damage.
    10.Install the fastener: fixing the each sides of panel with mechanical fastener to ensure it safe and durable.
    11.Professional glue stick to the trim strip: embed the insulation stripe into the seams of grids.
    12.Sealing: caulking with self-researched waterproof sealant.
    13.Clean the construction site 

    4)THE FORTH STAGE:COMPLETION ACCEPTANCE
    1.Inspection: in strict accordance with the requirements of engineering quality.
    2.Mending: mending which is not qualified, and make it perfect.
    3.Inspection and acceptance: in accordance with existing national standards for construction quality acceptance.

    ZANBOND TECHNOLOGY CO.,LTD